N2 Team · VHP decontamination ← Back to the mission

Continuous tunnel against modular batch

Both lines run the same process at the same speed. Use the controls to change chamber length, conveyor speed, takt time and minimum stay, then trigger a failure and watch what each architecture does with it. The counters show units released.

Process phase 1 Process phase 2 Process phase 3 Rejects
continuous process
batch process
000
000